東風(fēng)節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)說明書

上傳人:仙*** 文檔編號(hào):26857173 上傳時(shí)間:2021-08-13 格式:DOC 頁數(shù):83 大小:2.66MB
收藏 版權(quán)申訴 舉報(bào) 下載
東風(fēng)節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)說明書_第1頁
第1頁 / 共83頁
東風(fēng)節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)說明書_第2頁
第2頁 / 共83頁
東風(fēng)節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)說明書_第3頁
第3頁 / 共83頁

下載文檔到電腦,查找使用更方便

15 積分

下載資源

還剩頁未讀,繼續(xù)閱讀

資源描述:

《東風(fēng)節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)說明書》由會(huì)員分享,可在線閱讀,更多相關(guān)《東風(fēng)節(jié)制閘設(shè)計(jì)畢業(yè)設(shè)計(jì)說明書(83頁珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。

1、 1 水閘畢業(yè)設(shè)計(jì)任務(wù)書 .1 東風(fēng)節(jié)制閘設(shè)計(jì)原始數(shù)據(jù) .2 設(shè)計(jì)總說明 .4 第一章 水閘樞紐布置 .12 1.1 總體布置 .12 1.1.1 水閘位置時(shí)應(yīng)考慮的幾個(gè)因素 .13 1.2 結(jié)構(gòu)布置 .13 1.2.1 閘室的結(jié)構(gòu)布置 .13 1.2.2 兩岸連接布置 .14 1.2.3 防滲排水布置 .14 1.2.4 消能防沖布置 .15 第二章 水閘的水力計(jì)算 .16 2.1 閘孔設(shè)計(jì) .16 2.1.1 上下游水位的確定 .16 2.1.2 閘孔尺寸設(shè)計(jì) .18 2.1.3 堰型選擇 .19 2.1.4 閘墩厚度的選擇 .20 2.1.5 水閘泄流能力校核 .20 2.2 消能防沖設(shè)

2、計(jì) .21 2.2.1 節(jié)制閘泄流特點(diǎn): .21 2.2.2 消能設(shè)計(jì)條件 .21 2.2.3 水閘的消能方式 .22 2.2.4 消力池設(shè)計(jì) .23 2.2.5 海漫設(shè)計(jì) .28 2.2.6 防沖槽設(shè)計(jì) .30 2.3 防滲排水設(shè)計(jì).31 2.3.1 防滲設(shè)施布置 .31 2.3.2 閘基防滲長度校核 .34 2.3.3 排水設(shè)施的設(shè)計(jì) .37 第三章 閘室及地基的抗滑穩(wěn)定計(jì)算 .38 3.1 閘室輪廓尺寸的確定.38 3.1.1 閘頂高程與閘門高度 .38 3.1.2 底板形式及尺寸 .39 3.1.3 閘墩 .40 3.1.4 啟閉設(shè)備 .41 2 3.1.5 工作橋 .42 3.1.6

3、 交通橋 .43 3.1.7 各部分重量計(jì)算 .43 3.1.8 分逢與止水 .44 3.2 閘室穩(wěn)定計(jì)算 .44 3.2.1 作用于閘室上的荷載和組合 .45 3.2.2 閘室基底應(yīng)力、抗傾及抗滑穩(wěn)定驗(yàn)算 .47 3.2.3 閘基深層滑動(dòng)及地基沉降量計(jì)算 .52 第四章 平面鋼閘門設(shè)計(jì) .53 4.1 平面鋼閘門的結(jié)構(gòu)形式及布置.53 4.1.1 閘門尺寸的確定 .54 4.1.2 主梁的形式 .54 4.1.3 主梁的布置 .54 4.1.4 梁格的布置和形式 .55 4.1.5 聯(lián)結(jié)系的布置和形式 .55 4.1.6 邊梁與行走支承 .55 4.2 面板設(shè)計(jì).55 4.2.1 估算面板厚

4、度 .55 4.2.2 面板與梁格的連接計(jì)算 .57 4.3 水平次梁、頂梁和底梁的設(shè)計(jì).57 4.3.1 荷載與內(nèi)力計(jì)算 .57 4.3.2 截面選擇 .59 4.3.3 水平次梁的強(qiáng)度驗(yàn)算 .60 4.3.4 水平次梁的撓度驗(yàn)算 .60 4.3.5 頂梁和底梁 .60 4.4 主梁的設(shè)計(jì).61 4.4.1 設(shè)計(jì)資料 .61 4.4.2 截面選擇 .61 4.4.3 截面改變 .63 4.4.4 翼緣焊縫.63 4.4.5 腹板的加勁肋和局部穩(wěn)定驗(yàn)算 .64 4.4.6 面板局部彎曲與主梁整體彎曲的折算應(yīng)力驗(yàn)算 .64 4.5 橫隔板設(shè)計(jì).65 4.5.1 荷載和內(nèi)力計(jì)算 .65 4.5.2

5、 橫隔板截面選擇和強(qiáng)度計(jì)算 .65 4.6 縱向聯(lián)結(jié)系設(shè)計(jì).66 4.6.1 荷載和內(nèi)力計(jì)算 .66 4.6.2 斜桿截面計(jì)算 .66 4.7 邊梁設(shè)計(jì).67 4.7.1 荷載和內(nèi)力計(jì)算 .67 4.7.2 邊梁的強(qiáng)度驗(yàn)算 .68 4.8 行走支承設(shè)計(jì).69 4.8.1.膠木滑塊尺寸確定 .69 3 4.8.2 確定軌道底板的寬度 .69 4.8.3 確定軌道底板厚度 .69 4.9. 閘門啟閉力與吊座計(jì)算.69 4.9.1 啟門力計(jì)算 .69 4.10.導(dǎo)向裝置設(shè)計(jì).70 4.10.1 止水 .70 4.11 閘門啟閉力與吊座計(jì)算.71 4.11.1 吊軸和吊耳板驗(yàn)算 .71 第五章 翼墻的

6、結(jié)構(gòu)設(shè)計(jì) .72 5.1 翼墻的結(jié)構(gòu)設(shè)計(jì) .72 5.1.1 上游翼墻的結(jié)構(gòu)設(shè)計(jì) .73 5.1.2 岸墻的結(jié)構(gòu)設(shè)計(jì) .75 5.1.3 下游翼墻的結(jié)構(gòu)設(shè)計(jì) .76 5.1.4 上游翼墻的防滲設(shè)施及下游翼墻的排水設(shè)施設(shè)計(jì) .76 5.1.5 翼墻防滲和排水的布置 .76 5.1.5 止水的結(jié)構(gòu)形式和排水設(shè)備的構(gòu)造 .77 1 水閘畢業(yè)設(shè)計(jì)任務(wù)書 一 畢業(yè)設(shè)計(jì)的目的和要求 畢業(yè)設(shè)計(jì)是專業(yè)教學(xué)工作中的重要環(huán)節(jié)之一,通過設(shè)計(jì)實(shí)踐力求達(dá)到如 下目的與要求: 鞏固、加深、擴(kuò)大所學(xué)的基本理論和專業(yè)知識(shí),并使其進(jìn)一步系統(tǒng)化。 1 培養(yǎng)學(xué)生運(yùn)用所學(xué)知識(shí)解決實(shí)際工程技術(shù)問題的能力,要 求掌握設(shè)計(jì)原則、設(shè)計(jì)方法和

7、步驟。 2 培養(yǎng)學(xué)生獨(dú)立思考、獨(dú)立工作的能力。通過畢業(yè)設(shè)計(jì)加強(qiáng) 計(jì)算、繪圖、編寫設(shè)計(jì)文件、使用規(guī)范等方面的能力。 二 畢業(yè)設(shè)計(jì)內(nèi)容 1 根據(jù)基本數(shù)據(jù)及水閘樞紐的使用要求,確定水閘的樞紐布 置及組成結(jié)構(gòu)的型式與尺寸。 2 針對(duì)水閘樞紐,進(jìn)行水力計(jì)算、防滲設(shè)計(jì)和穩(wěn)定計(jì)算。對(duì) 組成水閘的各構(gòu)件進(jìn)行結(jié)構(gòu)計(jì)算及配筋設(shè)計(jì)。 3 平面鋼閘門設(shè)計(jì)。 三 設(shè)計(jì)成果 完成設(shè)計(jì)說明書及計(jì)算書各一份,工程設(shè)計(jì)圖紙 4 張。 1 總體布置平面圖, (繪于地形圖上) ; 2 縱向剖面圖與平面布置圖; 3 水閘上、下游立視和主要細(xì)部大樣圖; 4 平面鋼閘門上、下游立視、側(cè)視及俯視圖(包括門槽及埋 件、軌道、止水、止水座、護(hù)

8、角) ,材料表(將門葉構(gòu)件依次編號(hào)逐 項(xiàng)填入表中,包括名稱、形狀、規(guī)格、數(shù)量) ,說明。 2 東風(fēng)節(jié)制閘設(shè)計(jì)原始數(shù)據(jù) 一 設(shè)計(jì)概況 東風(fēng)水閘位于我國北方 A 河右岸河畔上的一座中型節(jié)制水閘,其功用為攔 蓄部分洪水,以補(bǔ)充地下水及解決農(nóng)業(yè)灌溉用水。 二 工程簡況 1 閘址位置: A 河為一古老河道,彎彎曲曲,河道呈 S 彎狀;選 S 彎的兩個(gè)凸 岸為閘址較為適當(dāng),優(yōu)點(diǎn)是地域開闊,工程布置在自然土基上,施 工導(dǎo)流與主體工程施工無干擾,閘址基本在河道中心線上。其缺陷 為上、下游連接段較長,工程量較大。 2 工程規(guī)模: 該水利工程按 5 年一遇洪水設(shè)計(jì),20 年一遇洪水校核,引渠邊 坡 m=2,縱坡

9、i=1/4000,渠底高程 46.8 米,設(shè)計(jì)流量 Q 設(shè)129.4 立方米秒。校核流量 Q 校=237 立方米/秒,最高設(shè)計(jì)蓄水位 51.6 米,一次蓄水量 50 萬立方米,灌溉農(nóng)田面積 3.5 萬畝。 三 地形情況 閘區(qū)西部位于丘陵地區(qū),西高東低,地面坡度為 140011000,東部 為沖積平原,地勢較平坦,地面坡度為 1250014000。 四 工程地質(zhì)情況 在閘址范圍內(nèi)鉆孔 5 個(gè),孔深 20 米,總進(jìn)尺 100.9 米,取原狀樣 5 個(gè),散 狀樣 24 個(gè),標(biāo)準(zhǔn)貫入試驗(yàn) 56 個(gè),作以上土樣的物理力學(xué)試驗(yàn)及擊實(shí)實(shí)驗(yàn)各一 組。試驗(yàn)表明:閘基處土層為河湖相沉積物,N 63. 5=11,地

10、質(zhì)自上而下劃分為五 個(gè)工程地質(zhì)單元。 第 I 單元,表層為耕植壤土,厚 1.0 米,可塑。其下為壤土、黏土及砂 壤土,總厚 3.54.8 米,底板標(biāo)高在 46.947.3 米之間。 第 II 單元,自上而下為淤泥質(zhì)壤土、砂壤土、裂隙粘土,總厚度 3.44.0 米,底板高程在 43.0643.08 米,分布連續(xù)穩(wěn)定。 第 III 單元, 巖性主要為淤泥質(zhì)壤土,總厚 2.54.2 米,底版高程在 39.340.3 米,土質(zhì)均勻,可塑.有自然孔洞,中高壓縮性,頂部有零星分布的砂壤 土,底部局部分布有黏土。 第 IV 單元,巖性主要為砂壤土,夾薄層壤土,還有零星分布的細(xì)砂層,總厚度 3.84.8 米,

11、底板高程 35.636.8 米。 第 V 單元, 巖性主要為裂隙黏土和裂隙壤土,頂高程 35.636.8 米,分布穩(wěn) 定,局部夾薄層粉砂。 3 閘底板高程與河床齊平在 46.8 米處,相當(dāng)于第 II 工程地質(zhì)單元頂部,持力 層影響范圍內(nèi)的第 II、III、IV、V 單元土的壓縮性不均,一般土層為中偏低壓 縮性,建筑物主要持力層地基土為軟塑的淤泥質(zhì)壤土及連續(xù)分布的裂隙土。 勘探范圍內(nèi),地下水初見水位埋深 3.54.3 米,有微弱承壓性,施工時(shí)注意 預(yù)降地下水位,防止 II,III 單元土層破壞。 五 .水文氣象 由水文分析,東風(fēng)閘以上流域面積 877.7km2,其中山區(qū) 471.3 km2,平原

12、 406.4 km2,年徑流量 95%年份有 317 萬立方米,扣除 60%沿途水量損失及 0.7 的 不均勻系數(shù),還有 88.8 萬立方米,滿足本閘一年一次蓄水量,保證灌溉效益。 該區(qū)平均氣溫 12 度,年平均降雨量 571 毫米,最大降雨量 1510 毫米,最小降 雨量 129.5 毫米,70%集中在 7、8、9 三個(gè)月,多年平均蒸發(fā)量 931 毫米,該區(qū)風(fēng) 速一般在 4m/s,最大風(fēng)速 13m/s,吹程 150 m,無霜期平均 220 天。 六 交通情況 閘本身無專門交通要求,考慮農(nóng)田耕作及水閘自身施工運(yùn)行要求設(shè)人行便橋。 七 設(shè)計(jì)數(shù)據(jù) 地基土壤物理力學(xué)性質(zhì)及力學(xué)指標(biāo) 流限 W T=25

13、.6% 滲透系數(shù) K T=1.1x10-6 m/s 塑限 W P=17.2% 凝聚力(室內(nèi)值) C=2T/m 2 塑性系數(shù) I P=8 內(nèi)摩擦角(室內(nèi)值) =16 地基壓縮模量 E Kg/cm 2 濕容重 r 濕 =1.75T/m3 含水量 W=31.3% 飽和容重 r 飽 .90T/m 3 孔隙比 e=0.73 干容重 r 干 =1.6T/m3 地基承載力 =15T/m 2 浮容重 r 浮 =1.0T/m3 閘底板與地基土摩擦系數(shù) f=0.35 夯實(shí)回填土內(nèi)摩擦角=25 上下游引渠糙率 n=0.025 引渠底寬(上,下游) b=28m 引渠邊坡系數(shù)(上,下游) m=2 混凝土容重 r=2.4

14、T/m3 鋼筋混凝土容重 r=2.5T/m3 4 設(shè)計(jì)總說明 水閘是灌排工程的主要建筑物之一,它是一種利用閘門進(jìn)行擋水或泄水的 低水頭水工建筑物,既可控制流量又可調(diào)節(jié)水位。關(guān)閉閘門時(shí),它可攔洪蓄水, 擋潮或抬高閘前水位;開啟閘門時(shí),又可泄洪排澇或?qū)ο掠魏拥阑蚯拦┧?這次我們主要設(shè)計(jì)修建在平原河道上的節(jié)制閘。 節(jié)制閘一般跨越河道修建,用于枯水期蓄水,抬高水位以供進(jìn)水閘取水, 洪水期開閘泄洪。在渠系中一般位于支、斗渠分水口稍下游,跨越干、支渠修 建,用于抬高干、支渠水位,供支、斗渠取水。 本次設(shè)計(jì)主要分為以下六部分: 1、分析資料及水閘樞紐布置 已提供的資料是設(shè)計(jì)的基本依據(jù),為使設(shè)計(jì)成果安全、

15、適用、經(jīng)濟(jì),首先 應(yīng)熟悉并分析各種資料,如地形、地質(zhì)情況,各有關(guān)高程,特征水位及相應(yīng)流 量等,然后根據(jù)閘址地形、地質(zhì)、水流等條件以及該樞紐中各建筑物的功能、 特點(diǎn)、運(yùn)用要求,確定樞紐布置,做到緊湊合理,協(xié)調(diào)美觀,組成整體效益最 大的有機(jī)聯(lián)合體。 2、水力計(jì)算 主要包括閘孔設(shè)計(jì)、消能防沖設(shè)計(jì)、防滲排水設(shè)計(jì)。 閘孔設(shè)計(jì) 首先根據(jù)上面擬定的水閘型式及設(shè)計(jì)流量,確定閘孔凈寬及適宜孔數(shù)。然 后再驗(yàn)算初擬閘孔尺寸的過流量是否滿足泄流要求。 消能防沖設(shè)計(jì) 為了消除水流過閘后的能量,設(shè)計(jì)了消力池、海漫和防沖槽。 消力池:計(jì)算在設(shè)計(jì)蓄水位下,閘門在各種運(yùn)行工況和不同開啟高度 時(shí)的泄流量,確定是否設(shè)消力池。若需設(shè)

16、置則根據(jù)消能條件,計(jì)算消力池 深、長、底板厚度及所用建筑材料。 海漫:消力池能消除水流 50的能量,其余能量由海漫消除,根據(jù)水 閘不同泄量的水力計(jì)算,布置海漫,確定長度及建筑材料。 防沖槽:計(jì)算海漫末端河床沖刷深度,設(shè)計(jì)計(jì)算防沖槽斷面形狀、尺 寸、確定拋石量及護(hù)坡砌置深度。 防滲排水設(shè)計(jì) 首先擬定水閘地下輪廓線型式,初步計(jì)算所需長度,然后依次確定閘室底 板、鋪蓋長度及材料,設(shè)計(jì)反濾層及排水孔位置,最后計(jì)算閘基滲透壓力,繪 制滲透壓力分布圖。 5 3、閘室的布置設(shè)計(jì)及閘室穩(wěn)定性計(jì)算 閘室輪廓尺寸確定 由水力條件及水閘功用,確定閘室總寬、閘頂高程、閘墩、閘門、底板的 型式與尺寸,閘室上部結(jié)構(gòu)的工作

17、橋、交通橋、啟閉設(shè)備的型式與尺寸。 閘室穩(wěn)定計(jì)算 選取計(jì)算單元,計(jì)算作用于閘室的荷載,并按計(jì)算條件進(jìn)行組合。分別按 完建期,正常蓄水期,正常蓄水加特殊荷載組合三種工況進(jìn)行閘室抗滑穩(wěn)定性 和地基承載力驗(yàn)算,并對(duì)地基應(yīng)力分布狀態(tài)及沉降差進(jìn)行計(jì)算分析,判斷水閘 地基是否滿足承載力、抗滑穩(wěn)定和變形要求。 閘基深層滑動(dòng)及地基沉降量計(jì)算 根據(jù)設(shè)計(jì)資料給出的土壤物理力學(xué)特性指標(biāo),驗(yàn)算在荷載作用下基礎(chǔ)是否 發(fā)生帶動(dòng)一部分地基土向下游深層滑動(dòng),并確定是否進(jìn)行地基沉降量計(jì)算。 4、兩岸連接建筑物岸、翼墻的結(jié)構(gòu)型式,布置及穩(wěn)定性計(jì)算 由閘室的結(jié)構(gòu)尺寸及地基條件,確定岸、翼墻的平面布置型式,結(jié)構(gòu) 型式,斷面尺寸。 按

18、完建期和正常蓄水期兩種工況,對(duì)岸、翼墻的地基承載力,基底最 大最小應(yīng)力比值及基底面抗滑穩(wěn)定進(jìn)行計(jì)算。 上游翼墻的防滲設(shè)施及下游翼墻的排水設(shè)施設(shè)計(jì)。 5、閘室結(jié)構(gòu)計(jì)算 閘墩應(yīng)力分析 將閘墩視為固接于底板上的懸臂梁,以閘墩和底板的結(jié)合面作為計(jì)算控制 面,分別按運(yùn)用期(閘門關(guān)閉擋水)和檢修期(一孔檢修其它孔過水)兩種工 況,計(jì)算中墩墩底水平截面垂直正應(yīng)力、剪應(yīng)力、門槽應(yīng)力、墩底水平截面?zhèn)?向應(yīng)力,并分析計(jì)算結(jié)果,進(jìn)行配筋設(shè)計(jì)。 底板應(yīng)力分析 以閘門為界,將底板分為上下兩部分,分別在兩部分中央垂直水流方向取 單寬板條進(jìn)行分析。按完建期和運(yùn)用期兩種工況,計(jì)算作用于板條上的荷載。 包括底板自重,中、邊墩及

19、上部結(jié)構(gòu)重,水重 ,揚(yáng)壓力及不平衡剪力并對(duì)其進(jìn) 行分配,按彈性地基梁郭氏法查表計(jì)算,求得地基反力及計(jì)算板條各截面的內(nèi) 力,分析計(jì)算結(jié)果進(jìn)行底板配筋設(shè)計(jì)。 6、平面鋼閘門設(shè)計(jì) 門葉結(jié)構(gòu) 門葉結(jié)構(gòu)布置:確定門葉結(jié)構(gòu)所需的各種構(gòu)件,數(shù)目及所在位置,梁 格及聯(lián)結(jié)系的型式、連接方式,行走支承及邊梁的型式。 6 面板設(shè)計(jì):在充分發(fā)揮面板強(qiáng)度的前提下,設(shè)計(jì)一經(jīng)濟(jì)合理的面板厚 度。并在主梁截面確定之后校核面板的局部彎曲與整體彎曲的折算應(yīng)力強(qiáng) 度。 水平次梁、頂、底梁設(shè)計(jì):均采用型鋼。由各構(gòu)件的內(nèi)力,選擇各梁 的截面,并進(jìn)行強(qiáng)度、剛度驗(yàn)算。 主梁設(shè)計(jì):確定主梁數(shù)目、位置、截面型式,斷面尺寸,截面改變, 翼緣焊縫

20、設(shè)計(jì)及主梁局部穩(wěn)定驗(yàn)算。 豎直次梁及橫縱向聯(lián)結(jié)系設(shè)計(jì):確定其型式及位置,由內(nèi)力計(jì)算選擇 截面尺寸及強(qiáng)度驗(yàn)算。 邊梁設(shè)計(jì):由行走支承確定邊梁結(jié)構(gòu)型式,按構(gòu)造要求設(shè)計(jì)邊梁,并 對(duì)其危險(xiǎn)截面進(jìn)行強(qiáng)度校核。 行走支承設(shè)計(jì):確定其結(jié)構(gòu)型式、尺寸,并進(jìn)行強(qiáng)度驗(yàn)算。 導(dǎo)向裝置設(shè)計(jì):確定反、側(cè)行走支承型式,位置及連接方式。 止水、吊耳設(shè)計(jì):確定止水型號(hào)及布置方式,由啟門力設(shè)計(jì),吊軸及 吊耳板尺寸并對(duì)吊耳板強(qiáng)度進(jìn)行驗(yàn)算。 門槽埋設(shè)構(gòu)件 確定門槽各軌道型式,斷面尺寸,對(duì)主軌進(jìn)行強(qiáng)度校核。 確定止水座及門槽護(hù)角構(gòu)件型式。 閘門鎖室裝置設(shè)計(jì)。 啟閉機(jī)械選擇 計(jì)算啟門力,確定啟閉機(jī)類型、型號(hào)。 計(jì)算閉門力,校核是否應(yīng)采

21、取工程措施降門。 吊具設(shè)計(jì):由啟門力設(shè)計(jì)吊索。 關(guān)鍵詞:水閘;閘室;平面閘門;防滲排水;主梁 7 Design the leader The sluice is irriated and arranged one of the main buildings among the project,it is a kind of low flood peak water conservancy project builing utilizing the gate to block water or sluice, can control the adjustable water level of t

22、he flow. While closing the gate, it can block the big conservation storage, the tide of the shelf or improving the water level in front of the floodgate, can release floodwater, drain flooded fields or supple water of the downstream river or the channel while opening the gate. We design the check ga

23、te built on plain and river mainly this time. The check gate generally crosses over the river to build, used in dry season conservation storage, redound water level for sluice fetch water, turn on floodgate release floodwater flood period. In canal is it prop up to lie in generally among the departm

24、ent, lateral canal divide into water mouth low reaches slightly, use for redounding the water level of branch canal, for propping up, the lateral canal fetch water This design is divided into six following parts mainly: 1.It is analysed that the materials and sluice pivot are fixed up. The materials

25、 that have already been offered are basic bases designed, in order to edable designing the achievement safe, suitable, economy, should be familiar with and analyse various kinds of materials at first, for instance topographical, geological situation, each about high Cheng, characteristic water level

26、 and corresponding flow, ect, then according to floodgate location, topography, geology, rivers, etc, terms and every building of function, characteristic, use demanding to confirm the pivot is decorateds of the pivot this, accomplish the structure compactness, rational, coordinates, beautiful. 2.Wa

27、ter conservancy is calculated: Including floodgate hole design, is it can is it wash the design, prevention of seepage drain off water and design to defend to 8 disappear mainly. The hole is designed in the floodgate give design flow definitely confirm according to sluice form and materials that dra

28、ft above floodgate hole clear width and suitable floodgate hole count at first, then checking computations plan floodgate hole size pass flow satisfied with the requirement of releasing floodwater for the first time. Disappear and can defend and print designing for dispel water flow through energy o

29、f floodgate,is it disappear strength pool, sea overflow and defend and wash the trough to design. Disappear in the strength pool calculate in design water storage level under the terms, gate turn on in various kinds of form, operating mode of operation and hole of floodgate, one pair of holes is tur

30、ned on symmetrically, three holes open and different flow of letting out while opening the height at the same time,confirm whether to need to set up and subdueing the strength pool or not. If is it design to need, want according to condition of can disappearing,is it disappear depth, strength of poo

31、l to calculate, thickness of the length baseplate and construction material used. The sea overflowing disappear strength pool can dispel rivers 50% energy,other energy all over the place to dispel from sea,according to different letting out amount of the sluice,confirm long degree and construction m

32、aterial of sea. Defend and wash the trough calculate sea overflow end wash hole depth, is it wash trough section form and size to defend to design. The prevention of seepage drains off water and designs: Draft the underground outline line at first, confirm the length tentatively, then confirm the fl

33、oodgate room baseplate, length of the bedding and material sequentially, design and strain layer and drain off water in the hole position instead, calculate the base osmotic pressure of the floodgate finally, draw the distribution map of the osmotic pressure. 3.The floodgate room is decorated and fl

34、oodgate room stability is 9 calculated: Confirm the size of the outline line of floodgate room confirmed the floodgate room is always wide by the water conservancy condition, floodgate high Cheng, floodgate mound, gate, pattern, size and floodgate room top structure job bridge, traffic bridge, open

35、and close pattern and size of the equipment of baseplate very. The floodgate room is calculated steadily choosing the unit of calculating, build one according to finishing, normal conservation storage one, normal conservation storage issue add special to is it make up three opeerating mode checking

36、computations floodgate room resist slippery stability and ground bear the weight of strength checking computations to load, distribute state and subside to ground stress difference carry on computational analysis, judge sluice ground meet strength of bearing the weight of, is it slip steady and out

37、of shape requirement to resist. The deep layer of floodgate room is slipped and the subsiding amount of ground is calculated according to design soil physics characteristic index that materials provide, checking computations foundation is it drive some ground soil slip to the low reaches to happen u

38、nder loading function, confirm whether to carry on the subsiding amount of the ground to calculate or not. 4.Tow sides join building-bank,structure pattern, wing of wall, assign and the stability is calculated: By physical dimension and ground terms, floodgate of room, confirm bank, level, wing of w

39、all assign the pattern and size of section. Building an two kinks of operating modes of one and normal conservation storage according to finishing, the ground on other bank, wing wall bears the weight of strength, basis heavy minimum stress ratio count bottom surface of the base is it calculate to g

40、o on steadily to slip to resist most. Facilities of prevention of seepage in the wing wall of the upper reaches and pumping equipment on the downstream wing wall are designed. 10 5.The structure of floodgate room is calculated: Mound stress analysis of the floodgate: Regard as floodgate firm to conn

41、ect cantilever beam at baseplate by mound, regard the combination surfaces of the mound of the floodgate and baseplate as and calculate the chain of command, separately according to use issue (gate is it block water to shut off ) and overhaul issue two kinds of operating modes , mound vertical direc

42、t stress of horizontal section, shearing stress, trough stress of the door, mound bottom level sectional side direction stress of mound bottom while calculating, analyse result of calculation, is it mix muscle design to go on. Stress analysis of the baseplate: Make gate as the boundry, divide basepl

43、ate into two part from head to foot, fetch single wide lath analyse in two part central vertical rivers direction separately. Accord to finishing and building one and using the operating mode of an improved variety, calculate the load on function and lath. Including the baseplate conducts oneself wi

44、th dignity,china, mound and top structure are heavy, raise pressure and uneven to cut strength and is it assign to go to it, France check the watch calculates according to elastic ground roof beam guo, try to get ground and calculation lath each sectional internal force against strength, is it carry

45、 on baseplate mix muscle design to analyse. 6.The level gate is designed: Leaf structure of the door. The layout of the structure of leaf of the door:Confirm door leaf various kinds of component structure need, figure and position , Ge Liang and pattern, way of connecting, connection of department,

46、pattern of walking and supporting and roof beam. The panel is designed :On the premise of giving full play to the intensity of the panel, design one thickness of panel with rational economy. And check some and crooked intensity of conversion stress with crooked whole of the panel after the girder se

47、ction is confirmed. 11 Level roof beam once, carrying, the botttom roof beam is designed: Adopt the section steel.By the internal force of every component, choose the section of every roof beam, carry on intensity, rigidity checking computation. The girder is designed: Confirm girder figure, positio

48、n, sectional form, the size of section, the section changes, wing reason welding seam design and some steady checking computations of girder. Vertical roof beam once and horizontal vertical connection department design:Confirm its pattern and position , is calculated and chosen sectional size and in

49、tensity checking computations by the internal force. The roof beam is designed:Is it confirm to support to walk roof beam structure patern is according to construct requirement design roof beam, and carry on the intensity to check to its dangerous section. Walk and support designing: Confirm its str

50、ucture pattern, size carry on intensity checking compitation. Lead the device to design: Confirm the inside out, side and walk and support the pattern, the position and way of connecting. Stagnant water, lifting lug are designed:Confirm the type of the stagnant water and assign the way, is opened do

51、or strength to design, hang the axle and board measurement of the lifting lug and carry on checking computations to the intensity of the lifting lug board. The door trough is buried the component underground. Confirm every track pattern of the door trough, the size of section, carry on the intensity

52、 to check to the main rail . Confirm stagnant water seat and door trough protect the horn component pattern. Lock the room device to design in the gate. Open and room device to design in the gate. Calculate and open the strength of the door, comfirm the type of headstok gear, type. Calculate and clo

53、se the strength of the door, should take 12 the project measure to lower the door to check. The hoist is designed: Opened door strength and designed the sling. Key word: Sluice; floodgate room; level gate; prevention of seepage drain off water and design to defend to disappear; girder 13 第一章 水閘樞紐布置

54、1.1 總體布置 本設(shè)計(jì)為節(jié)制閘,一般跨越河道修建,故又稱為攔河閘。它是一種利用閘 門進(jìn)行擋水或泄水的低水頭建筑物,既可控制流量又可調(diào)節(jié)水位。關(guān)閉閘門時(shí), 它可攔洪蓄水,擋潮或抬高閘前水位;開啟閘門時(shí),又可泄洪,排澇或?qū)ο掠?河道或渠道供水。這次我們主要設(shè)計(jì)修建在平原道上的 節(jié)制閘。節(jié)制閘一般跨 越河道修建。用于枯水期蓄水,抬高水位以及供進(jìn)水閘取水,洪水期開閘泄洪。 在渠系中一般位于支、斗渠分水口稍下游,跨越干、支渠修建也稱節(jié)制閘。用 于抬高干、支渠水位,供支、斗渠取水。 閘址一般應(yīng)設(shè)置在河道直線段上。閘址處于上下游河道直線段長度均不短 于 510 倍水面寬度,且不宜小于 300m。 壩址選擇

55、是水閘規(guī)范設(shè)計(jì)中的一項(xiàng)重要工作,閘址合適與否,不僅涉及到 水閘建設(shè)的成敗,并且關(guān)系到整個(gè)地區(qū)的經(jīng)濟(jì)發(fā)展,因此對(duì)閘址選擇的工作應(yīng) 十分重視。 水閘的類型較多,按其任務(wù)不同,可分為以下幾類; 進(jìn)水閘:為了農(nóng)田灌溉或其他水利事業(yè)的需要,進(jìn)水閘往往建在河道, 水庫或湖泊的岸邊,用于引水灌溉,發(fā)電或其他進(jìn)水需要而控制流量。 節(jié)制閘:由于農(nóng)田灌溉,發(fā)電引水或改善航運(yùn)要求,常需橫快河道或渠 道修建水閘,以控制閘前水位和過閘流量,這類水閘成為節(jié)制閘。河道上的節(jié) 制閘也也稱為攔河閘。在洪水時(shí)期,攔河閘還起排泄洪水作用。 擋潮閘:濱海地區(qū)的河流都受潮水影響,為了防止海水倒灌而抬高內(nèi)河 水位,常在入海處河口附近修建

56、水閘,即為擋潮閘。漲潮時(shí)關(guān)閘,防止海水倒 灌;當(dāng)內(nèi)河水位過高落潮期間開閘排水。擋潮閘的特點(diǎn),是承受雙渣向水頭, 而且閘門啟閉頻繁。 排水閘:為使低洼地區(qū)大的漬水通過排水渠排入江河或湖泊,常需在排 水渠末端設(shè)置水閘,這當(dāng)河道類水閘稱為排水閘。排水閘除開閘排水外,在枯 水季還可向內(nèi)引水灌溉;洪水時(shí)可關(guān)閘擋水,防止外水倒灌,也可蓄水灌溉。 特點(diǎn)是:是承受雙向水頭。 分洪閘:當(dāng)河道遭遇洪水而對(duì)下游可能造成洪災(zāi)時(shí),可將部分洪水泄入 湖泊或洼地以消減洪峰。在分洪道首部需設(shè)置水閘,即為分洪閘。分洪閘常建 于河道的一側(cè),用來將超過下游河道安全泄量的洪水泄入分洪區(qū)或分洪道。 沖沙閘(排沙閘):沖沙閘(排沙閘)建

57、在多泥沙的河流上。用于排除 進(jìn)水閘,節(jié)制閘或渠系中沉積的泥沙。此外,還有為排除冰塊,漂浮物等而設(shè) 14 置的排冰閘,排污閘等。 1.1.1 水閘位置時(shí)應(yīng)考慮的幾個(gè)因素 地基條件 是影響水閘總體布置的主要因素之一應(yīng)盡可能選擇土質(zhì) 密實(shí),均勻。壓縮性較小和承載能力較大的良好地基。此外,由于閘基土 質(zhì)的抗沖能力直接影響單寬流量的選擇和閘后消能防沖設(shè)備的設(shè)計(jì),而地 下水位的高低及承壓水的有無對(duì)地基的穩(wěn)定性和施工期的排水措施也有所 影響,故在選擇閘址時(shí)應(yīng)考慮這些條件。 水流條件 是另一主要因素閘的位置應(yīng)使進(jìn)閘和出閘水流平順,防 止上,下游 產(chǎn)生有害的沖刷和淤積。 施工、管理?xiàng)l件 也是閘址選擇時(shí)要考慮的一

58、個(gè)因素要求有足夠?qū)?廣的施工場 地,并且盡可能使土方工程量最小。當(dāng)水閘是整個(gè)樞紐的一個(gè)組成部 分時(shí),應(yīng)就樞 紐工程總體布置做方案比較,得出水閘最優(yōu)位置,以達(dá)到技術(shù)上先進(jìn) 與經(jīng)濟(jì)上合理 的要求。 1.2 結(jié)構(gòu)布置 1.2.1 閘室的結(jié)構(gòu)布置 水閘一般由上有連接段,閘室,下有連接段三部分組成。水閘的主體是閘 室,其結(jié)構(gòu)型式是多種多樣的,主要取決于泄放水流的方式以及閘門的構(gòu)造和 操作方式。按照閘室的泄流特點(diǎn)分類,可以分為以下幾種型式: 1.堰流式閘室 當(dāng)閘門全開時(shí)過閘水流具有自由水面的水閘成為溢流式閘室,也稱開敞式 閘室。一般堰檻高程較高,擋水高度較小的水閘都采用這種型式,依靠閘門擋 水。當(dāng)閘門全部

59、打開時(shí),水閘的過水面積和泄流量都隨水位的抬高而增大,對(duì) 于需要泄放洪水的攔河閘和分洪閘來說,這是一個(gè)很大的優(yōu)點(diǎn)。 2.孔流式閘室 當(dāng)閘門全開時(shí),自由水面仍受阻擋,水流只能通過固定洞孔泄入下游,稱 為孔流式閘室,也成為封閉式閘室。當(dāng)閘檻高程較低,閘室高度較大,需要泄 放或取用底層水流時(shí),常采用這種型式。一般把閘室頂部封閉。例如設(shè)置胸墻 擋水,底部設(shè)置孔口泄水,這樣可以減少閘門尺寸。這種泄流方式最適合于沖 15 沙閘的工作條件,有其突出的優(yōu)點(diǎn)。 3.混合泄流式閘室 這是一種既具有面流溢流能力,又具有底孔泄流能力的閘室結(jié)構(gòu)。構(gòu)造上 分為上下兩層,分別裝設(shè)閘門。開啟上層閘門,利用面層溢流泄放洪水和漂流

60、 物。開啟下層閘門,則利用底孔沖刷閘前淤泥的泥沙。這種類型的閘室多用于 攔河節(jié)制閘或引水系統(tǒng)的進(jìn)水閘上。有時(shí)在特別軟弱的淤泥質(zhì)地基上建閘,為 了加強(qiáng)閘室的橫向剛度,借以減小地基的不均勻沉降和閘室的結(jié)構(gòu)變形,在閘 室的過水?dāng)嗝嬷性O(shè)一層水平橫隔板,型式上亦構(gòu)成了上下兩層泄水通道,但常 常共用一個(gè)閘門,在運(yùn)用要求上與混合泄流式閘室不盡相同。 本水閘設(shè)計(jì)閘門全開時(shí)具有自由水面,擋水高度較小,且依靠閘門擋水, 故可采用開敞式閘室。根據(jù)已知資料,初步采用開敞式閘室。 底板 是整個(gè)閘室結(jié)構(gòu)的基礎(chǔ),承受水閘上部結(jié)構(gòu)的重量及荷載并 向地基傳遞的結(jié)構(gòu),同時(shí)兼有防滲及防沖作用,防止地基由于受滲透水流 作用可能產(chǎn)生的

61、滲透變形并保護(hù)地基免受水流沖刷。本設(shè)計(jì)初步采用平底 板。 閘墩 是閘門和各種上部結(jié)構(gòu)的支撐體,由閘門傳來的水壓力和上 部結(jié)構(gòu)的重量和荷載通過閘墩傳布于底板。閘墩通常采用實(shí)體式,其外形 輪廓設(shè)計(jì)應(yīng)能滿足過閘水流平順,側(cè)向收縮小,過流能力大的要求。本設(shè) 計(jì)初步采用上游墩頭半圓形,下游墩頭流線形的型式。 閘門 其結(jié)構(gòu)的選型布置應(yīng)根據(jù)其受力情況控制運(yùn)用要求、制作、 運(yùn)輸、安裝維修條件等,結(jié)合閘室結(jié)構(gòu)布置合理選定。本設(shè)計(jì)初步采用平 面鋼閘門。 啟閉機(jī) 其型式可根據(jù)門型尺寸及其運(yùn)用條件等因素選定。本設(shè)計(jì) 初步采用卷揚(yáng)式平面閘門啟閉機(jī)。 閘室上部的工作橋、交通橋 根據(jù)閘孔孔徑,閘門啟閉機(jī)型 式及容等分別選用

62、板式、梁板式、板拱式,其與閘墩的連接型式應(yīng)與底板 分縫及胸墻支撐型式統(tǒng)一考慮。本設(shè)計(jì)初步選用梁板式。 1.2.2 兩岸連接布置 水閘兩岸連接應(yīng)能保證岸坡穩(wěn)定改善水閘進(jìn)出水流條件提高泄流能力和消 能防沖效果,滿足側(cè)向防滲需要,減輕閘室底板邊荷載影響,且有利于環(huán)境綠 化等。上下游翼墻宜與閘室及兩岸岸坡平順連接。 1.2.3 防滲排水布置 當(dāng)閘基為中壤土,輕壤土或重壤土?xí)r閘室上游宜設(shè)置鋼筋混凝土或黏土鋪 16 蓋或土工膜防滲鋪蓋,閘室下游護(hù)坦底部應(yīng)設(shè)反濾層。本設(shè)計(jì)初步采用鋼筋混 凝土鋪蓋。 1.2.4 消能防沖布置 水閘消能防沖布置應(yīng)根據(jù)閘基地質(zhì)情況,水力條件以及閘門控制運(yùn)用方式 等因素進(jìn)行綜合分析

63、確定。本設(shè)計(jì)初步采用底流消能方式。 17 第二章 水閘的水力計(jì)算 水力計(jì)算包括: 設(shè)計(jì)水閘的閘孔,出流以滿足進(jìn)流、出流、控制水位要求。 設(shè)計(jì)水閘的消能防沖設(shè)施,使水閘避免沖刷。 設(shè)計(jì)水閘的防滲排水設(shè)施,使水閘避免滲透變形。 2.1 閘孔設(shè)計(jì) 閘孔型式:包括閘底板的型式(堰型) 、閘門、閘門頂部胸墻。 閘孔尺寸:包括閘底板的頂面高程,閘孔凈寬和孔數(shù)。 2.1.1 上下游水位的確定 上游水位:在河道上建閘后,上下游將形成一定水頭差,上游水位是由規(guī) 劃決定。由設(shè)計(jì)資料給出,該節(jié)制閘的最高設(shè)計(jì)蓄水位為51.6m。本設(shè)計(jì)上游 應(yīng)低于最高設(shè)計(jì)蓄水位,采用50.5 m。 下游水位:因水閘上下游為人工開挖渠道

64、,其表面糙率沿程不變,設(shè)渠道 中無任何阻礙水流運(yùn)動(dòng)的建筑物,故下游可按明渠均勻流計(jì)算。作出渠道下游 h 下 Q 關(guān)系曲線 ,以備在不同流量下,直接由該曲線查得下游水位。 閘孔凈寬的控制情況通常是宣泄設(shè)計(jì)或校核流量時(shí),此時(shí)閘門全部開啟, 多為淹沒流態(tài)。由于閘孔寬度一般小于河道寬度,水流過閘時(shí)側(cè)向收縮,并使 上游水面雍高而形成閘上下游水位差 H。該水位差的大小關(guān)系到閘室工程量 和上游淹沒損失。水閘的過閘水位差應(yīng)根據(jù)上游淹沒影響,允許的過閘單寬流 量和水閘工程造價(jià)等因素綜合比較選定。根據(jù)水閘設(shè)計(jì)規(guī)范 ,一般情況下, 平原水閘的過閘水位差可采用 0.1m0.3m。在水閘設(shè)計(jì)中,如采用較大的過閘 水位差

65、,可縮減閘孔總凈寬,降低水閘工程造價(jià)但抬高了水閘的上游水位,不 僅要加高上游堤頂高程而且可能增加上游淹沒損失,因此為了減輕上游堤防負(fù) 擔(dān)也不允許過分抬高水閘的上游水位,因此采用較小的過閘水位差選用 H=0.2m。 (一般情況下,平原區(qū)水閘的過閘水位差可采用 0.1-0.3 m) 下面先假設(shè) h t根據(jù)水力學(xué)公式 式(2.1)QACRi 式中: A明渠斷面積 ()bmh 求得流量 Q,列表如下 18 表 2.1 水頭-流 量 計(jì)算表 H (m) A (m2) X (m) R (m) C (m0.5/s) Q (m3/s) 1.0 30 32.47 0.924 39.477 18.000 1.5

66、46.5 34.71 1.340 42.000 35.746 2.0 64 36.94 1.733 43.839 58.400 2.5 82.5 39.18 2.106 45.287 85.721 3.0 102 41.41 2.463 46.484 117.654 3.5 122.5 43.65 2.806 47.505 154.131 4.0 144 45.89 3.138 48.399 195.207 4.5 166.5 48.12 3.460 49.193 240.170 根據(jù)上表,繪制 htQ 曲線。見圖 2-1 由 htQ 曲線查的 Q 設(shè) =129.4m3/s 時(shí), ht=3.2 m 即下游水位為 h t=3.2 m。 由設(shè)計(jì)資料可知,渠底高程為 46.8m,則下游水位高程為 下 = 3.2 m+46.8m=50.00m。 19 上下游水位差為 H=0.2m。 上游水位 上 = 下 +H=50.00m+0.2m=50.2 m。 2.1.2 閘孔尺寸設(shè)計(jì) 水閘閘孔形式包括孔口型式(開敞式,胸墻式)和底板型式,底板型式有 款頂堰和低實(shí)用堰兩種,寬頂堰結(jié)構(gòu)簡單施工方便,泄流能力

展開閱讀全文
溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號(hào):ICP2024067431號(hào)-1 川公網(wǎng)安備51140202000466號(hào)


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺(tái),本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng),我們立即給予刪除!