歡迎來(lái)到裝配圖網(wǎng)! | 幫助中心 裝配圖網(wǎng)zhuangpeitu.com!
裝配圖網(wǎng)
ImageVerifierCode 換一換
首頁(yè) 裝配圖網(wǎng) > 資源分類 > DOC文檔下載  

廠房租賃合同 英文.doc

  • 資源ID:979444       資源大?。?span id="mk2wcqm" class="font-tahoma">13.04KB        全文頁(yè)數(shù):3頁(yè)
  • 資源格式: DOC        下載積分:10積分
快捷下載 游客一鍵下載
會(huì)員登錄下載
微信登錄下載
三方登錄下載: 微信開放平臺(tái)登錄 支付寶登錄   QQ登錄   微博登錄  
二維碼
微信掃一掃登錄
下載資源需要10積分
郵箱/手機(jī):
溫馨提示:
用戶名和密碼都是您填寫的郵箱或者手機(jī)號(hào),方便查詢和重復(fù)下載(系統(tǒng)自動(dòng)生成)
支付方式: 支付寶    微信支付   
驗(yàn)證碼:   換一換

 
賬號(hào):
密碼:
驗(yàn)證碼:   換一換
  忘記密碼?
    
友情提示
2、PDF文件下載后,可能會(huì)被瀏覽器默認(rèn)打開,此種情況可以點(diǎn)擊瀏覽器菜單,保存網(wǎng)頁(yè)到桌面,就可以正常下載了。
3、本站不支持迅雷下載,請(qǐng)使用電腦自帶的IE瀏覽器,或者360瀏覽器、谷歌瀏覽器下載即可。
4、本站資源下載后的文檔和圖紙-無(wú)水印,預(yù)覽文檔經(jīng)過壓縮,下載后原文更清晰。
5、試題試卷類文檔,如果標(biāo)題沒有明確說(shuō)明有答案則都視為沒有答案,請(qǐng)知曉。

廠房租賃合同 英文.doc

合同范本/租賃合同 廠房租賃合同 英文 factory rental contractfirst party:second party (tenant):dongguan city . the property is owned by first party, both parties have come to an agreement and first party is renting the factory and dormitory to second party. both parties have already voice out about their requirement, after signing the contract, that means both parties have to follow and abide the rules accordingly. the details of the rental agreement contract are as per follow:一:location of the rental factory : 二: the lease period : from year month day to year monthday first three years are fixed , last 2 years will have some adjustment, 3 years later the rent are to increased by rmb per square meter.the total lease period are years.三:the factory area : rental charges:the whole building area includes factory 、dormitory and facility are about square meter(the actual usable space might not be square meter, but rental fees are calculated by this square meter which was shown in this contract agreement) from year month day to year month day, the rental charges are k rmb per month, second party should pay for rmb to first party each month. from to , second party should pay for mb to first party each month . first party are provide 2 months for renovation, in this 2 months there will be no rental charges during the renovation period, and the rental charges will only begins on methods for payment1. deposit for the factory : after signing the contract , second party should pay rmb as deposit within days. second part will also need to pay rmb for the 1st month rental too. after completing the contract agreement duration period, second party has to paid the wages, utilities bills, rental and incurred bills and also did not break any of the rules in the agreements. ( means second party did not break the contract or damage the factory/structure or the facilities) after the confirmation of the 1st party that everything is ok, the deposit will be return back to the 2nd party by the 1st party and the contract ends too, or else the deposit will be confiscated by the 1st party.2. payment: second party must pay the rent before on that month.五:the requirement for the usage of the factory: second party should take good care of the factory , dormitory and the other facilities , 2nd party should not change the structure or damage the building structure. when second party want to change the structure of the factory second party should consult with first party, and get the first party s consent first.六:insurance:

注意事項(xiàng)

本文(廠房租賃合同 英文.doc)為本站會(huì)員(仙***)主動(dòng)上傳,裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。 若此文所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng)(點(diǎn)擊聯(lián)系客服),我們立即給予刪除!

溫馨提示:如果因?yàn)榫W(wǎng)速或其他原因下載失敗請(qǐng)重新下載,重復(fù)下載不扣分。




關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號(hào):ICP2024067431號(hào)-1 川公網(wǎng)安備51140202000466號(hào)


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺(tái),本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng),我們立即給予刪除!